In the 1940s, in the course of the development of the railway network of the Kazakh SSR, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a precast concrete plant (RC) in...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Esil is a railway station in the Akmola region of Kazakhstan. Directions to Astana, Kartaly and Arkalyk pass through it.
In the period 1946-1955, Lengiprotrans designed a landfill at the...
Kostanay (now Kostanay) is a railway station in the Kostanay region of Kazakhstan. Trains to Chelyabinsk, Astana, Alma-Ata, Karaganda, Arkalyk pass through it. Suburban trains also run to...
Tobol is a railway station on the Akmolinsk - Kartaly line in the Kostanay region of Kazakhstan.
In the period 1946-1955, Lengiprotrans designed a landfill at the station for the production of...
Back in the pre-war period, Lentransproekt (since 1951 — Lengiprotrans) started design and survey work on the Kartaly — Akmolinsk (now Astana) — Pavlodar line, which became an important link in...
Kurgan — Atbasar is a meridional railway project developed by Lengiprotrans for the development of virgin lands and transportation of grain crops.
Hydrological and hydrogeological surveys of...
Pages