In 1950-1960, the electrification of the Oktyabrskaya railway, the Bologoye railway junction was carried out, the technical re-equipment of the depot was underway. During this period,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Carrying out a complex of engineering surveys requires a large number of equipment and vehicles. In this regard, in 1950-1960, specialists from the Architectural and Construction Department...
Karaganda is a railway station in the Karaganda region of Kazakhstan. Coal mining is carried out in the region, enterprises of mechanical engineering, metalworking and food industry operate.
In...
Atbasar is a railway station on the Tobol - Astana line in the Akmola region of Kazakhstan.
In the period 1950-1970s, the Department of Plants (now part of the OPGS) of Lengiprotrans designed...
Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
Tselinograd (now Astana) is a railway station of the Kazakhstan Railways in the capital of Kazakhstan, the city of Astana.
In the period 1950-1970s, the Department of Plants (now part of the...
Pages