Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
Рижский электротехнический завод
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) carried out design work to restore factories of various profiles. In particular, a project for the reconstruction of the Riga...
  • 1940 — 1949
  • 1950 — 1959
Цех переформирования колесных пар паровозов и тендеров немецких железных дорог
In the postwar years "Lentransproekt" (since 1951 - "Lengiprotrans") carried out design work on the reconstruction of factories and the design of new ones in order to restore the country's...
  • 1940 — 1949
Железнодорожная линия Кизел — Пермь
The single-track railway line of the Sverdlovsk railway, on a steam-locomotive traction with a baton method, was built according to the project of Lentransproekt (since 1951 - Lengiprotrans) in...
  • 1940 — 1949
Железнодорожная линия Поляны — Шлиссельбург с мостом через Неву
The temporary railway line Polyana — Shlisselburg, known as the Victory Road, played a huge role in the fate of besieged Leningrad during the Great Patriotic War. On January 18, 1943, Soviet...
  • 1940 — 1949
Железнодорожная линия Сталинград — Саратов — Свияжск
During the Great Patriotic War, with the participation of Lentransproekt employees (since 1951 - Lengiprotrans), the Stalingrad - Saratov - Sviyazhsk railway line was designed and built to solve...
  • 1940 — 1949
Железнодорожная линия Войбокало — Кобона — Коса
Prospecting and design work along the Voybokalo - Ladoga Lake line was carried out by employees of the Vologda expedition and the Leningrad project group in the most unfavorable conditions of a...