Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Красноярский железнодорожный узел
In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development of the Krasnoyarsk railway junction. This was due to the construction of the second track. 
  • 2010 — 2019
Генеральная схема развития железнодорожного узла Санкт-Петербурга и Ленинградской области
The general scheme for the development of the railway junction of St. Petersburg and the Leningrad Region was developed by Lengiprotans in 2014. The project is aimed at the timely...
  • 1950 — 1959
  • 1960 — 1969
Станция стыкования постоянного и переменного токов Балезино
Balezino is a station on the Kirov - Perm line of the Gorkovskaya railway. It is one of the key traction current docking stations on the Russian railway network, serving both passenger and freight...
  • 1940 — 1949
  • 1950 — 1959
Генеральная схема развития Ленинградского железнодорожного узла на 1950–1965 годы
For many years, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1950s, the institute developed a general...
  • 1990 — 1999
Железнодорожный узел Великие Луки
Velikiye Luki is a large railway junction of the Oktyabrskaya Railway, through which the lines Moscow - Riga and Bologoye - Polotsk pass. Velikie Luki station was opened in 1901 on the Moscow-...
Pages