The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1960–1970,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The production base "Kokchetavtransstroy" GUZhDS of Kazakhstan and Central Asia (Main Directorate of Railway Construction of the USSR Ministry of Transport Construction) was built according to the...
In the 1970s, Lengiprotrans developed a traction substation project at Skriveri station in Latvia.
Longitudinal and transverse profiles were prepared, external power supply of the facility was...
In the 1970s, Lengiprotrans engineers designed a base for the repair of metro cars in Kiev. The facility was created with the aim of organizing all types of metro car repairs in order to return...
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
Railway line Delyatyn - Rakhov - state border - section of the Lvov railway.
The project of strengthening retaining walls, subgrade and structures on the section Delyatin - Rakhov - state...