The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1960–1970,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
For many years, Lengiprotrans has been designing the Virgin Railway, which runs through the territory of Northern and Central Kazakhstan. This was due to the development of virgin fallow lands...
Kaliningrad-Sortirovochny is a cargo station of the Kaliningrad railway.
The station development project was developed by Lengiprotrans in the 1970-1980s. In the course of the survey,...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
The Institute took part...
In the 1970s, Lengiprotrans developed a project for the electrification of the Tselinograd (now Astana) - Ekibastuz section of the Tselinnaya railway.
At the Ekibastuz-I station, the following...
In 1960-1970s Lengiprotrans designed a road bridge across the Khani River as part of the construction of the Baikal-Amur Mainline (BAM). The structure is located at 447 km of the BAM. Along the...
Pages