The Norilsk Railway is an isolated railway network in the north of the Krasnoyarsk Territory. It is one of the northernmost steel lines in the world.
In the 1980s, Lengiprotrans prepared a...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Lengiprotrans has done a lot of work on the reconstruction of the carriage facilities and, first of all, car repair depots (WRD). Among other objects, the WFD was designed at the Ekibastuz II...
In the 1980s, Lengiprotrans engineers designed various objects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for a railway overpass on the Vilnius —...
During the Soviet period, Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were designed, in...
During the Soviet period Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were reconstructed, in...
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya — Bovanenkovo railway line. In particular, a locomotive depot was designed at the Obskaya station...
Pages