Railway section Ekibastuz II - Stopping point 116 km is part of the Ekibastuz railway junction. He was engaged in design work on the reconstruction and development of the Lengiprotrans unit for a...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Kokchetav (now Kokshetau) is the administrative center of the Akmola region of Kazakhstan.
In the 1980s, according to the Lengiprotrans project, the City Vocational School for 480 students was...
In the 1980s Lengiprotrans was involved in solving transport problems in the Komi Republic. Design of a road bridge under the direction of A.P. Petrova contributed to the solution of transport...
The fuel and energy complex is located here, including the large thermal power plant Ekibastuzskaya GRES.
In the 1970s – 1980s, Lengiprotrans developed a project for an access railway to the...
Muuga Port is a commercial sea port in Estonia on the shores of the Muuga Bay, which is part of the Gulf of Finland. It was built in 1986 to transport grain crops to the USSR; in the future, it...
The electrification of the section Kokchetav (now Kokshetau) - Tselinnye Sands (now Novoishimskaya) was developed by Lengiprotrans in 1983. The site was equipped with a contact network.
Within...
Pages