Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
Цех технического обслуживания пассажирских вагонов на станции Калининград
In the 1990s, Lengiprotrans developed a project for a workshop for the maintenance of passenger cars at the Kaliningrad station. A building with utilities was designed for technical inspection of...
  • 1980 — 1989
ЭЦ разъезда Цементный завод
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 2010 — 2019
Генеральная схема развития железнодорожного узла Санкт-Петербурга и Ленинградской области
The general scheme for the development of the railway junction of St. Petersburg and the Leningrad Region was developed by Lengiprotans in 2014. The project is aimed at the timely...
  • 1970 — 1979
Электрификация участка Ленинград-Сортировочный-Московский — Ручьи — Парголово
The line Leningrad-Sortirovochny-Moskovsky - Ruchyi - Pargolovo - suburban sections of the Leningrad railway junction, is part of the Oktyabrskaya railway. In the 1970s, according to the...
  • 1960 — 1969
  • 1970 — 1979
Остановочный пункт Университет
The Universitet passenger stop is located at 35 km of the Baltic line of the Oktyabrskaya railway. The project of the stopping point was developed by Lengiprotrans as part of the development of...
Pages