In the late 1980s, Lengiprotrans developed a project for the reconstruction of a bridge across the diversion canal on the road to the Estonian State District Power Plant in the city of Narva.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
During the Soviet period, Lengiprotrans was actively involved in the design of transport infrastructure in the Baltics. This was largely due to the development of approaches to ports in the Baltic...
In 2000, Lengiprotrans took part in the design of the overpass between Dunaysky Prospekt and the railway tracks of the Vitebsk direction of the Oktyabrskaya Railway. The overpass connected the...
In the 2010s, Lengiprotrans developed a project for a road overpass on the Tammisuo - Gvardeyskoye section of the Vyborg-Kamenogorsk railway section to replace three closed crossings in the...
The highway overpass is designed at the intersection of the Vyborg - Kamennogorsk railway line with the Komsomolskoye - Priozersk highway near the Vozrozhdenie station of the Leningrad Region. The...