In 1954, a large-scale development of virgin and fallow lands began in the Kazakh SSR and a number of adjacent regions. The Council of Ministers of the USSR adopted a Resolution on the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Esil - Lomonosovskaya - Uritskoye railway line is a narrow-gauge railway that played a significant role in the first period of the development of the virgin lands of Kazakhstan.
The project...
On September 20, 1954, the Council of Ministers of the USSR adopted Resolution No. 1985 "On the construction of narrow-gauge railway lines in the areas of virgin and fallow lands development" in...
Since its inception, Lentransproekt (since 1951 - Lengiprotrans) has been involved in the transport development of the Kazakh SSR. In the 1950s, the Kostanay (now Kostanay) - Tobol - Dzhetygara (...
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. One of such objects, the bridge crossing at the dam of the Kaunas HPP hydroelectric power...
The railway line Pavlovsk - Vyritsa - Poselok is a section of the Vitebsk line of the Oktyabrskaya railway.
The project for the electrification of the Leningrad-Pavlovsk section was developed...
Pages