In the 1950s, Lengiprotrans drew up a project to replace mechanical interlocking with relay interlocking with route control of switches and signals at Siauliai station.
In 1965-1966, a complex...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Atbasar is a station in the Akmola region of Kazakhstan. In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans developed a project for...
Esil is a station in the Akmola region of Kazakhstan. Trains follow through it in the directions to Astana, Kartaly, Arkalyk.
In 1950-1970, during the transport development of virgin lands and...
Iron ore is a station in the Kostanay region of Kazakhstan.
In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans developed a project...
Akmolinsk (now Astana) is a railway station in the capital of Kazakhstan.
In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans...
Daugavpils is a junction railway station of the Latvian Railway. Through it, trains follow in the direction of the stations: Krustpils, Rezekne, Egleine, Indra.
In the period 1956-1970,...
Pages