Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Тепловозное депо Великие Луки
The Velikie Luki depot is located at the station of the same name on the Oktyabrskaya railway. The company was founded at the beginning of the 20th century at the intersection of the Moscow-...
  • 1950 — 1959
  • 1960 — 1969
Вагонное депо Воркута
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
  • 1950 — 1959
  • 1960 — 1969
Электровозное депо в Норильске
In the 1960s, the former Lengiprotrans Plants Department developed a project for an electric locomotive depot in Norilsk. This was due to the beginning of the replacement of steam locomotives on...
  • 1970 — 1979
  • 1980 — 1989
Рижский ремонтно-механический завод
In the 1970s, the former Lengiprotans Plants Department developed a project for the Riga Mechanical Repair Plant. The project provided for: - Compressor station with a capacity of 40 cubic...
  • 1950 — 1959
  • 1960 — 1969
Тихорецкий ремонтно-механический завод
Tikhoretsk Mechanical Repair Plant (now Tikhoretsk Machine-Building Plant named after V.V. Vorovsky) was founded in 1899 at the Tikhoretskaya junction station of the North Caucasian Railway. It...
  • 1950 — 1959
  • 1960 — 1969
Бушевецкий ремонтно-механический завод
In 1950-1960, the electrification of the Oktyabrskaya railway, the Bologoye railway junction was carried out, the technical re-equipment of the depot was underway. During this period,...