The Shotkusa-Megrega railway line runs in the North-West of Russia, through the territories of the Leningrad Region and the Karelian Republic.
The railway line was built according to the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1970s, Lengiprotrans engineers were designing an overpass at the intersection of Leninsky Prospekt and Narodniy Opolcheniya Avenue on the Predportovaya-Narvskaya stretch. This interchange...
Tselinograd - Kokchetav (now Astana - Kokshetau) is a meridional line connecting the South Siberian and Central Siberian lines in Kazakhstan.
In the 1970s, Lengiprotrans developed a project for...
The mining and processing plant (GOK) "Apatit" was established in 1929 on the basis of the Khibiny deposits of apatite-nepheline ores. The GOK mines apatite for the aluminum industry, processes...
In the 1960s-1970s, Lengiprotrans developed a project for remote control of the fencing of trains at the Shkirotava station in Latvia.
Also at the station, the institute designed:
• adaptation...
In 1970-1980, Lengiprotrans carried out design and survey work for the construction of a new marshalling yard in the Vilnius railway junction. Engineering and geological materials were prepared...
Pages