In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
Pages