In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Leningrad-Tovarny-Finlyandsky (now St. Petersburg-Tovarny-Finlyandsky) - station of the October railway.
In the 1970s, according to the Lengiprotrans project, a new container yard was built at...
TCh-1 Avtovo is a depot on the Kirovsko-Vyborgskaya line of the Petersburg metro. This is the first metro depot in St. Petersburg, opened in 1955.
In the 1970s, Lengiprotrans developed a...
Dolgorukov's dacha is a station of the October railway within the St. Petersburg railway junction, founded in 1913.
In the 1970s, according to the Lengiprotrans project, a site for heavyweights...
Alytus is a railway station on the Šeštokai - Alytus line of the Lithuanian Railway.
In 1978 Lengiprotrans carried out design and survey work at the station. Longitudinal and transverse...
In 1950–1960, the electrification of the suburban sections of the Leningrad railway junction was widely carried out in accordance with the 1956 decree "On the general plan for the electrification...
Pages