Solonichki — Bolshaya Mikhailovka — section of the Kazakhstan railway.
In the 1980s, according to the Lengiprotrans project, the modernization of signaling devices on the railway section and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Ekibastuz II - station of the Kazakhstan railway in the area of a large coal deposit.
In 1970-1980, within the framework of the construction of railway approaches to the Ekibastuz industrial...
Baigul - Karazhal - a section of the Karaganda - Karazhal line of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 3...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. In the 1980s, the institute developed a project for the Tartus-Latakia line for operational...
Tallinn is a passenger railway station in the capital of Estonia. The directions Narva - Tallinn, Tallinn - Viljandi pass through it.
In the 1980s, Lengiprotrans developed a project to...
In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
Pages






