Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
  • 1980 — 1989
Автодороги комбината «Апатит»
Apatit is a mining and processing plant (GOK) that produces phosphate raw materials. The GOK is located in the Murmansk region and is the backbone enterprise of Kirovsk and Apatitov. In 1970-...
  • 1980 — 1989
Автомобильная дорога Уренгой — Надым — Советский
In the 1980s, Lengiprotrans designed the Urengoy - Nadym - Sovetsky highway. The road starts from the Urengoyskaya main compressor station (GCS) in the area of ​​the city of Novy Urengoy and ends...
  • 1970 — 1979
Автодорога Костомукша — госграница
In the 1970s, Lengiprotrans took part in the development of the external transport system of the Kostomuksha Mining and Processing Plant (GOK). As part of this, the Kostomuksha highway - the state...
Pages