Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
  • 1980 — 1989
Железнодорожный мост через реку Имангру
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet —  Sovetskaya Gavan. In 1960–1970,...
  • 1970 — 1979
  • 1980 — 1989
Жилой дом в Кустанае
In the course of designing railway lines for the development of virgin lands and coal deposits in Kazakhstan, Lengiprotrans has developed a significant number of social housing projects for...
  • 1970 — 1979
  • 1980 — 1989
Перевод на телеуправление электрифицированного участка Рига — Тукумс
The Riga - Tukums railway line is a section of the Tornakalns - Tukums II electrified line in Latvia. In the period 1976–1980, Lengiprotrans developed a project for transferring the Riga -...
  • 1980 — 1989
Вторые пути на участке Сиверская — Луга
The Siverskaya - Luga railway line is a section of the Varshavskaya line of the Oktyabrskaya railway. The project of the second tracks on the section with electrification was developed by...
  • 1970 — 1979
  • 1980 — 1989
Клуб Ленинградского института инженеров железнодорожного транспорта
Leningrad Institute of Railway Transport Engineers named after Academician V.N. Obraztsova (LIIZhT, now the Emperor Alexander I St. Petersburg State Transport University, PGUPS) is a higher...
  • 1970 — 1979
  • 1980 — 1989
Переустройство узкоколейной линии Швенченеляй — Утена — Паневежис на широкую колею
In 1970-1980, Lengiprotrans developed a project for rebuilding the narrow-gauge line Svencheneliai - Utena - Panevezys to a wide track of 1520 mm. In the course of the work, geotechnical...
Pages