Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Тихорецкий ремонтно-механический завод
Tikhoretsk Mechanical Repair Plant (now Tikhoretsk Machine-Building Plant named after V.V. Vorovsky) was founded in 1899 at the Tikhoretskaya junction station of the North Caucasian Railway. It...
  • 1950 — 1959
  • 1960 — 1969
Тепловозное депо Сольвычегодск
The Solvychegodsk diesel locomotive depot is a depot at the station of the same name on the Northern Railway (SZD). It was organized in 1942 as a car repair site. In the postwar years,...
  • 1950 — 1959
  • 1960 — 1969
Бушевецкий ремонтно-механический завод
In 1950-1960, the electrification of the Oktyabrskaya railway, the Bologoye railway junction was carried out, the technical re-equipment of the depot was underway. During this period,...
  • 1950 — 1959
  • 1960 — 1969
Прижелезнодорожный почтамт в Риге
In 1950-1960s Lengiprotrans developed a project for a railway post office in Riga. At this facility, for the first time in the transport architecture, a large-span folded prefabricated reinforced...
  • 1950 — 1959
  • 1960 — 1969
Моторвагонное депо на станции Ленинград-Пассажирский-Московский
In the 1950s–1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
  • 1950 — 1959
Вторые пути на участке Кожва — Воркута
The railway line Kozhva - Vorkuta is a section of the North Pechora railway (since 1959 as part of the Northern Railway). The main line was built according to the project of Lentransproekt (...
Pages