Trust "Baltmorgidrostroy" was established in 1952 with the aim of restoring damaged sea and commercial ports, ship repair companies in the Baltic region.
In the cities of the Baltic coast (...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, during the development of the railway network of the Kazakh SSR, Lengiprotrans developed a project for a motor depot for the Kokchetavtransstroy Trust in Astana.
In those years,...
In the 1980s, in the course of the development of the railway network of the Kazakh SSR, Lengiprotrans developed a project for the plant of reinforced concrete structures of the...
The rest house for locomotive crews (DOLB), built according to the project of PJSC Lengiprotrans, is located at the Luzhskaya-Sortirovochnaya station of the Oktyabrskaya railway, in the...
In the 1980s, Lengiprotrans prepared a project for a temporary production base and a residential community for the construction of a canal on the Keitele-Päijänne section in Finland.
On the...
Privodino is a railway station of the Northern Railway in the Kotlassky District of the Arkhangelsk Region. In December 2004, an oil loading complex was built at the station.
Under the...
Pages