Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
Электрификация участка Чудово — Новгород
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
  • 1960 — 1969
Электрификация участка Мельничный ручей — Невская Дубровка
Railway line Melnichny Ruchey - Nevskaya Dubrovka - a section of the Irinovskaya direction of the Oktyabrskaya Railway (OZhD). The section Melnichny Ruchey - Nevskaya Dubrovka was electrified...
  • 1960 — 1969
  • 1970 — 1979
Электрификация участка Тосно — Малая Вишера — Бологое — Лихославль — Клин
The Tosno - Malaya Vishera - Bologoye - Likhoslavl - Klin railway line is part of the Oktyabrskaya Railway. The project for the electrification of the line was developed by Lengiprotrans in the...
  • 1960 — 1969
  • 1970 — 1979
Электрификация участка Беломорск — Лоухи — Кандалакша
The Belomorsk - Loukhi - Kandalaksha railway line is part of the Oktyabrskaya railway. The specialists of Lengiprotrans have developed a project for the electrification of this section. The...
  • 1950 — 1959
  • 1960 — 1969
Электрификация участка Таллин — Палдиски
Tallinn - Paldiski is a section of the Estonian Railway connecting the capital of Estonia with the port city of Paldiski on the coast of the Gulf of Finland. In the 1950s – 1960s Lengiprotrans...
Pages