Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
Уплотнение цветной цепи на участке Няндома — Мудьюга
Railway line Nyandoma - Mudyuga - a section of the Northern Railway. The project of sealing the colored chain on the line was prepared by Lengiprotrans in 1956. In the same period, similar work...
  • 1980 — 1989
Переустройство контактной сети на перегоне Буслово — Госграница
In 1989, Lengiprotrans prepared a project for the reconstruction of a contact network on the Buslova - State Border stretch in the area of ​​the state border with Finland.
  • 1980 — 1989
ЭЦ разъезда Ассен
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 1980 — 1989
ЭЦ разъезда Баниас
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 1980 — 1989
ЭЦ разъезда Маркия
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 1980 — 1989
ЭЦ разъезда Щербит
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
Pages