The second main track on the Shipovka - Post section 26 km

Author's department: 
Project Status: 
Второй главный путь на участке Шиповка — Пост 26 км

In the 1990s, Lengiprotrans developed a project for the second main track on the Shipovka - Post section of 26 km in the Kaliningrad railway.

In the course of engineering surveys, mine workings were made, water wells were developed.

At the facility, the following were designed: a track complex, water supply, a railway bridge at picket 245, reconstruction of railway tracks at Shipovka station.