At the turn of the 20th – 21st centuries, Russia began to actively introduce high-speed traffic into the railway network. Lengiprotrans has developed a project for organizing high-speed passenger...
JSC Lengiprotrans is the author of about 200 designs for transport projects in Saint Petersburg and Leningrad Region. The projects are railway lines, road interchange structures, bridges, overpasses, etc. Lengiprotrans developed designs for construction of all engine houses of the Saint Petersburg metro (subway), reconstruction of all railway terminals and construction of the Ladozhsky railway terminal, railway approaches to five out of six seaports of the Gulf of Finland.
All projects built and reconstructed on the basis of the design documentation developed by Lengiprotrans were carefully fitted into the architecture of the city.
The page shows the objects of the selected type, the design of which was performed in the selected period
Development of technical solutions for servicing the liquid cargo complex and passing the transit flow in the direction of Luzhskaya-General station and for the further development of the...
Svir is a docking station for direct and alternating current of the Oktyabrskaya railway. Lengiprotrans has developed a project for the station as part of the electrification of the Volkhovstroy...
In the early 2000s, Lengiprotrans developed a project for the reconstruction of the St. Petersburg railway junction with electrification and the development of intra-nodal lines.
The extension...
The main goal of the project was the development of technical solutions for the maintenance of terminals of ULTK (Ust-Luga Container Terminal), AJPK (Automobile and Rail Transshipment Complex),...
In 2011, the Ust-Luga Company established that by 2013–2014 the port's freight through the railway component is planned to be within 60 million tons.
In this connection, the construction of a...
Pages