Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2020 — 2029
Железнодорожный мост через реку Колу
Design and survey work on the construction of the new railway bridge began immediately after the collapse of the span of the old structure on June 1, 2020, under the influence of the abundant...
  • 2000 — 2009
Реконструкция железнодорожных мостов через Обводный канал
"American" bridges - a group of 5 railway bridges across the Obvodny Canal on the Moscow direction of the Oktyabrskaya Railway (OZhD). The first bridges were built in the 1840s as part of the...
  • 1990 — 1999
  • 2000 — 2009
Мостовые переходы через реку Славянка
In the late 1990s, Lengiprotrans developed a project for a multi-unit depot at the Metallostroy station, intended for servicing and repairing the ER2T electric trains of the Moscow and Vitebsk...
  • 1990 — 1999
  • 2000 — 2009
Мостовой переход через реку Вымь
The bridge over the Vym River was developed by the specialists of Lengiprotrans as part of the construction of the Chinyavoryk - Timan commercial railway. The line was intended to drive up to the...
  • 1990 — 1999
  • 2000 — 2009
Реконструкция железнодорожного путепровода в г. Вильнюс
In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for the reconstruction of a railway...
  • 1990 — 1999
Реконструкция мостовых переходов на железнодорожных путях Череповецкого металлургического комбината
In the 1990s, Lengiprotrans developed a project for the reconstruction of overpasses and overpasses on the connecting railway tracks of the Cherepovets Metallurgical Plant. 8 structures were...
Pages