Reconstruction of bridge crossings on the railway tracks of the Cherepovets Metallurgical Plant

Author's department: 
Project Status: 
Реконструкция мостовых переходов на железнодорожных путях Череповецкого металлургического комбината

In the 1990s, Lengiprotrans developed a project for the reconstruction of overpasses and overpasses on the connecting railway tracks of the Cherepovets Metallurgical Plant. 8 structures were designed with lengths from 100 to 593 m.