Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Переустройство узкоколейной линии Пярну — Мыйзакюла — Алоя на колею 1520 мм
In the 1970s, Lengiprotrans developed a project to rewire the Pärnu - Mõisaküla narrow-gauge section to the 1520 mm wide gauge line with access to the Riga - Aloa - Myizaküla broad gauge line....
  • 1980 — 1989
Вторые пути на участке Сиверская — Луга
The Siverskaya - Luga railway line is a section of the Varshavskaya line of the Oktyabrskaya railway. The project of the second tracks on the section with electrification was developed by...
  • 1970 — 1979
  • 1980 — 1989
Переустройство узкоколейной линии Швенченеляй — Утена — Паневежис на широкую колею
In 1970-1980, Lengiprotrans developed a project for rebuilding the narrow-gauge line Svencheneliai - Utena - Panevezys to a wide track of 1520 mm. In the course of the work, geotechnical...
  • 1970 — 1979
Вторые пути на участке Инта — Печора — Рыбница
The Inta - Pechora - Rybnitsa railway line is part of the Northern Railway. Lengiprotrans has developed a project of the second tracks on this section to increase the capacity on the instructions...
  • 1970 — 1979
Железнодорожная линия Ледмозеро — Костомукша — Госграница
In the 1970s Lengiprotrans took part in the development of the external transport system of the Kostomuksha Mining and Processing Plant (GOK). One of the first projects was developed for the...
  • 1970 — 1979
Желенодорожный транспорт порта Латакия
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia with the eastern regions of the...