Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Санаторий имени XX партсъезда в Кисловодске
In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-purpose...
  • 1980 — 1989
ЭЦ станций на участке Тобол — Джетыгара
Tobol - Dzhetygara is a section of the Kostanay - Dzhetygara railway line of the Kazakhstan railway. The line was designed by Lengiprotrans in the 1950s to transport iron ores from the Sokolovo-...
  • 1980 — 1989
Ленинградский завод по ремонту городского электротранспорта
The Leningrad City Electric Transport Repair Plant was founded in 1934 on Chugunnaya Street. The enterprise was intended for the production of rolling stock for the tramway system of Leningrad...
  • 1980 — 1989
  • 1990 — 1999
Модернизация устройств ЭЦ на станции Рига-Пассажирская
Riga-Passenger is the main railway station in the capital of Latvia. In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking devices (EC) for 130...
  • 1980 — 1989
Культурно-спортивный комплекс в Лабытнанги
Labytnangi is the terminal station of the Northern Railway, located in the Yamalo-Nenets Autonomous District of the Tyumen Region. The transshipment of goods to water transport is carried out here...
  • 1980 — 1989
Путепровод на пересечении Южного объезда с железнодорожными путем перегона Вильнюс — Киртимай
In the 1980s, Lengiprotrans developed a project for the construction of an overpass in Vilnius at the intersection of the Southern Bypass with the Vilnius-Kirtimai railway line.
Pages