Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
ЭЦ разъезда Кебир
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 1970 — 1979
Пункт подготовки вагонов на станции Апатиты
In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (...
  • 1970 — 1979
Электрификация участка Ленинград-Сортировочный-Московский — Ручьи — Парголово
The line Leningrad-Sortirovochny-Moskovsky - Ruchyi - Pargolovo - suburban sections of the Leningrad railway junction, is part of the Oktyabrskaya railway. In the 1970s, according to the...
  • 1960 — 1969
  • 1970 — 1979
Остановочный пункт Университет
The Universitet passenger stop is located at 35 km of the Baltic line of the Oktyabrskaya railway. The project of the stopping point was developed by Lengiprotrans as part of the development of...
  • 1980 — 1989
Завод железобетонных конструкций и деталей «Ленметростроя»
In the 1980s, Lengiprotrans developed a project for a plant of reinforced concrete structures and parts for Lenmetrostroy in the Kolomyaga industrial area of ​​St. Petersburg. The plant was...