Author's department:
Project Status:
In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (GOK). The GOK mines apatite for the production of fertilizers and nepheline for the aluminum industry, processes ore at aluminum-nepheline-processing plants for concentrate production and further transportation. In the same period, a wagon preparation point was designed at the Apatity station.