In 1960-1970s Lengiprotrans designed a road bridge across the Khani River as part of the construction of the Baikal-Amur Mainline (BAM). The structure is located at 447 km of the BAM. Along the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1960s – 1970s, Lengiprotrans prepared projects for highways in the Leningrad Region by order of the USSR Ministry of Agriculture.
A major overhaul of the existing roads was planned with...
Apatit is a mining and processing plant (GOK) that produces phosphate raw materials. The GOK is located in the Murmansk region and is the backbone enterprise of Kirovsk and Apatitov.
In 1970-...
In the 1970s, Lengiprotrans took part in the development of the external transport system of the Kostomuksha Mining and Processing Plant (GOK). As part of this, the Kostomuksha highway - the state...
Road Ledmozero - Kostomuksha - a section of the regional road Kochkoma - Ledmozero - Kostomuksha - the state border in Karelia. The highway connects the central regions of the republic and...
The Kirovsk-Afrikanda highway passes through the territory of the Murmansk region. The project of the road was developed by the specialists of Lengiprotrans in the 1970s.