Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1960 — 1969
Автодорожный мост через пролив Большая Салма
The highway bridge was designed and built in the 1960s and is located on the 1198 km of the Leningrad-Murmansk highway (the current name is R-21 "Kola"). Before the construction of the...
  • 1960 — 1969
Мост через р. Абакан
In 1950-1960s Lengiprotrans designed a bridge over the Abakan River as part of the construction of the Kyzyl - Mazhalyk (Aktovrak) - Abaza highway. The construction of the route made it possible...