Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
Вокзал Резекне
Rezekne railway station is located at the station of the same name of the Latvian Railway, in the east of the country. During the Second World War, the station, as a strategically important...
  • 1940 — 1949
Вокзал Сигулда
Sigulda Station is located at the station of the same name of the Latvian Railway, in the central part of the country. The original station building, built in 1925, was destroyed during the...
  • 1940 — 1949
Вокзал Вильнюс
Vilnius railway station is located in the capital of the same name of Lithuania. It was built in the 19th century on the former Petersburg-Warsaw railway. During the First and Second World Wars...
  • 1940 — 1949
Противообвальные сооружения на линии Быстровка — Рыбачье
Bystrovka - Rybachye - the railway section of the Lugovaya - Rybachye line, passing through the territory of Kyrgyzstan. The railway was designed by Lentransproekt (since 1951 - Lengiprotrans)...
  • 1940 — 1949
Укрепление каунасского косогора на Литовской железной дороге
In 1946, the Engineering Geology Department of Lentransproekt (since 1951 - Lengiprotrans) developed a project to strengthen the Kaunas slope on the Lithuanian Railway in order to ensure the...
  • 1940 — 1949
Восстановление автомобильного моста через реку Алле в г. Правдинск
In the post-war years "Lentransproekt" (since 1951 - "Lengiprotrans") developed projects for the restoration of many transport facilities in the USSR. In 1946-1947, a project was prepared for an...
Pages