Since the 1950s, Lengiprotrans has been developing a project for the West Karelian line, now part of the Oktyabrskaya railway. The transport development of the Karelian Autonomous Soviet Socialist...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1960, the electrification of the Oktyabrskaya railway, the Bologoye railway junction was carried out, the technical re-equipment of the depot was underway. During this period,...
Avtovo is the station of the Kirovsko-Vyborgskaya line of the Petersburg metro.
The department of factories (now part of the OPGS) of Lengiprotrans took an active part in the design of the...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of the central boiler house at the Kaliningrad station.
Later, in 1970-1979, the...
Lengiprotrans has been involved in the reconstruction and development of the Kaliningrad railway junction for decades, starting from the post-war period.
In 1951, the institute designed the...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) continued to work in Kazakhstan. In 1948-1955, the electrical interlocking of forty-nine turnouts was developed at the Bolshaya...