In the 1980s, the Architectural and Construction Department (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans designed a large number of multi-profile...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, Lengiprotrans developed a project for a pedestrian bridge at the Strugi Krasnye Oktyabrskaya railway station.
In the 1980s, Lengiprotrans developed a project for the production base for the construction and assembly train 675 of the Sevzaptransstroy trust in Tallinn.
At the facility, the following were...
The reconstruction of the bridge over the Narva River in the Estonian city of Narva was carried out according to the Lengiprotrans project.
Design and survey work began in 1985 when...
In the 1980s, Lengiprotrans engineers designed various projects in the Baltics. Thus, by order of the Baltic Railway, Lengiprotrans has developed a project for a railway overpass in the town of...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia with the eastern regions of the...