In 1960-1970, according to the Lengiprotrans project, the Balkhash - Sayak railway line was built in the Kazakh SSR. Transport links were required to supply Sayak ore to the Balkhash mining and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet - Sovetskaya Gavan.
In 1960-1970s "...
In the 1970s, Lengiprotrans developed a project for a modern building for the Rostov-Yaroslavsky railway station at the station of the same name on the Northern Railway.
A passenger building...
The railway line Tselinograd - Ekibastuz - Pavlodar is a part of the South Siberian Railway. During the Soviet period, this section was the most heavily loaded, which necessitated the construction...
Railway line Bui - Svecha - a section of the Northern Railway. In the 1960s - 1970s Lengiprotrans developed a project for second tracks on this section.
In 1967-1969, geological surveys were...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. Before the start of the institute's work, Syria had the only railway, which included the Homs-...