In 1960-1970, the Mikun - Koslan railway line in the Komi Republic was built according to the Lengiprotrans project. This contributed to the transformation of Mikun into a major junction station...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1960-1970, according to the Lengiprotrans project, the Balkhash - Sayak railway line was built in the Kazakh SSR. Transport links were required to supply Sayak ore to the Balkhash mining and...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet - Sovetskaya Gavan.
In 1960-1970s "...
Важной страницей в истории ПАО «Ленгипротранс» является проектирование Байкало-Амурской магистрали (БАМ) — самого масштабного объекта транспортного строительства XX века в России. Институт...
The Danilov - Bui - Svecha railway line is a section of the Northern Railway. In 1960-1970, Lengiprotrans developed a project for the electrification of this section within the framework of the...
Leningrad-Varshavsky - Shosseinaya - the former head section of the Varshavskaya line, which ran from the former Varshavsky railway station to the south of St. Petersburg.
The general plan for...
Pages









