In the 1970s, Lengiprotrans engineers designed a base for the repair of metro cars in Kiev. The facility was created with the aim of organizing all types of metro car repairs in order to return...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1970s – 1980s, Lengiprotrans developed a project for second tracks with electrification on the Kokchetav (now Kokshetau) - Tselinnye Sands - Presnogorkovskaya section by decree of the CPSU...
During the Soviet period, Lengiprotrans took an active part in the transport development of railway approaches and stations at the seaports in the Baltic States. For the development of the...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
The Institute took part...
In 1960-1970s Lengiprotrans designed a road bridge across the Khani River as part of the construction of the Baikal-Amur Mainline (BAM). The structure is located at 447 km of the BAM. Along the...
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
Pages



































