Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Пересадочная станция «Купчино»
The Kupchino station is located at the confluence of the Moscow-Petrogradskaya line of the Petersburg metro with the Vitebsk railway at 11 km. In this regard, the station had the project name "...
  • 1970 — 1979
  • 1980 — 1989
Переустройство участка Петрашюнай — Радвилишкис на колею 1520 мм
The railway line Petrasiunai (Pakruojis) - Radviliskis is a section of the Lithuanian railways. In the Baltic republics of the USSR, narrow-gauge railways prevailed, which complicated their...
  • 1970 — 1979
Пересадочная станция «Девяткино»
Station "Devyatkino" (until 1992 - "Komsomolskaya", project name "Kalininskaya") is located in the area of ​​the former stopping point Devyatkino, at the intersection of the Kirovsko-Vyborgskaya...
  • 1970 — 1979
Укрепление земляного полотна на участке Пыталово — Резекне
In the 1970s, Lengiprotrans developed a project to improve the roadbed on 382 km of the Pytalovo — Rezekne section of the Baltic railway. Were prepared transverse profiles, longitudinal...
  • 1970 — 1979
Автодорога Кировск — Африканда
The Kirovsk-Afrikanda highway passes through the territory of the Murmansk region. The project of the road was developed by the specialists of Lengiprotrans in the 1970s.
  • 1970 — 1979
Локомотивные и вагонные депо на станции Иваново
In the 1970s, the Lengiprotrans Plants Department (now part of the Industrial and Civil Buildings and Structures Department) carried out the design of locomotive and carriage facilities. During...
Pages