In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
Daugavpils railway station is located in the second largest city in Latvia. It was built in the 19th century on the former Petersburg-Warsaw railway.
The building was destroyed during the...
In the post-war years, Lentransproekt (since 1951 - Lengiprotrans) actively developed projects to restore the USSR railway infrastructure. One of them was a project for the restoration and...
In 1940-1950s, the Department of Plants (now the Department of Industrial and Civil Buildings and Structures) of Lengiprotrans was engaged in the restoration of the depot at the stations destroyed...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the construction project of the Gomel Electrotechnical Plant for the production...
Pages