Ekibastuz II - station of the Kazakhstan railway in the area of a large coal deposit.
In 1970-1980, within the framework of the construction of railway approaches to the Ekibastuz industrial...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Labytnangi is the terminal station of the Northern Railway, located in the Yamalo-Nenets Autonomous District of the Tyumen Region. The transshipment of goods to water transport is carried out here...
Baigul - Karazhal - a section of the Karaganda - Karazhal line of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 3...
Bata - Karabas is a section of the Kazakhstan railway.
In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 5 railway line stations with 21 turnouts...
In the 1980s, Lengiprotrans developed a project for the Obskaya — Bovanenkovo line, the northernmost railway in the world. The route starts from the Obskaya station, which is part of the...
For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. The main task was to connect the seaports of Tartus and Latakia with the eastern regions of the...
Pages