Narva is a border railway station on the Tallinn - Narva line of the Estonian Railways. Regular trains go through it in the direction of St. Petersburg and Moscow.
In the late 1960s - 1970s,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1970s, Lengiprotrans developed a project for a modern building for the Rostov-Yaroslavsky railway station at the station of the same name on the Northern Railway.
A passenger building...
Важной страницей в истории ПАО «Ленгипротранс» является проектирование Байкало-Амурской магистрали (БАМ) — самого масштабного объекта транспортного строительства XX века в России. Институт...
In 1960-1970, according to the Lengiprotrans project, the Balkhash - Sayak railway line was built in the Kazakh SSR. Transport links were required to supply Sayak ore to the Balkhash mining and...
In 1960-1970, the Mikun - Koslan railway line in the Komi Republic was built according to the Lengiprotrans project. This contributed to the transformation of Mikun into a major junction station...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet - Sovetskaya Gavan.
In 1960-1970s "...
Pages