In 1992-1994, Lengiprotrans, on the instructions of JSC Neftegaz, developed a feasibility study (FS) and working documentation for an access railway track to the export base of liquefied petroleum...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the late 1980s and early 1990s, Lengiprotrans carried out the electrification of the Cherkezkei - Kapykule railway section in the Republic of Turkey on the border with Bulgaria. It was the last...
Imanta is a residential area in the western part of Riga, located on the left bank of the Daugava River.
In 1991, by order of the Riga City Administration, Lengiprotrans developed a project for...
The bridge over the Allah-Yun River is designed for 190 km of the Eldikan - Yugorenok highway in the Republic of Sakha (Yakutia). The length of the structure is 266 m.
In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The bridge crossing over the Kyubyume River is designed for 321 km of the reconstructed Magadan-Yakutsk highway in the Republic of Sakha (Yakutia). The length of the structure is 182 m.
Pages

































