Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
Расширение производственной базы СУ-426 треста «Балтморгидрострой» в Лиепае
Trust "Baltmorgidrostroy" was established in 1952 with the aim of restoring damaged sea and commercial ports, ship repair companies in the Baltic region. In the cities of the Baltic coast (...
  • 1970 — 1979
Оборудование автоблокировкой участка Нарвская — Новый Порт
Narvskaya - Novy Port - a section of the St. Petersburg railway junction, is part of the Oktyabrskaya railway. In the 1970s, according to the Lengiprotrans project, the line was equipped with...
  • 1950 — 1959
Электровозное депо в Кандалакше
In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
  • 1980 — 1989
Реконструкция моста черз отводящий канал на автодороге к Эстонской ГРЭС
In the late 1980s, Lengiprotrans developed a project for the reconstruction of a bridge across the diversion canal on the road to the Estonian State District Power Plant in the city of Narva.
  • 1980 — 1989
  • 1990 — 1999
Сортировочная станция Кошта
Koshta is a sorting station of the Northern Railway in the Cherepovets District of the Vologda Oblast. The project of Koshta station was carried out by Lengiprotrans as part of the...
  • 1970 — 1979
Станция Алитус-Новая
Alytus is a railway station on the Šeštokai - Alytus line of the Lithuanian Railway. In 1978 Lengiprotrans carried out design and survey work at the station. Longitudinal and transverse...
Pages