Author's department:
Project Status:
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the first time at the stations, a compensated suspension of the overhead system is provided, which made it possible in the future to transfer the section to high-speed traffic without reconstructing the overhead system.