Author's department:
In the 1970s, Lengiprotrans developed a project for rebuilding the narrow gauge track of the Türi-Paide section to a wide 1520 mm gauge. Prepared: mine workings, groundwater analysis, geological profile. A feasibility study of the project has been prepared.