Electric depot "Pravoberezhnoe"

Электродепо «Правобережное»

Electric depot TC "Pravoberezhnoe" is a planned depot of the Pravoberezhnaya line of the St. Petersburg metro. In 1980-1990, Lengiprotrans developed a feasibility study for the construction of the facility. The structure was intended for maintenance and routine repair of electric trains.

The depot is supposed to be located behind the Kudrovo station, the project of which is also in the process of being implemented. The commissioning of the depot was scheduled for 2025.