Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Ремонтно-экипировочное депо на станции Архангельск
In the 1970s, the Lengiprotrans Plants Department (now part of the Industrial and Civil Buildings and Structures Department) carried out the design of locomotive and carriage facilities. During...
  • 2000 — 2009
Реконструкция локомотивного депо на станции Волховстрой-I
TCh-21 Volkhovstroy is a repair locomotive depot at the Volkhovstroy-I railway station in the Volkhov district of the Leningrad region. In the 2000s, the locomotive depot was reconstructed...
  • 1950 — 1959
  • 1990 — 1999
Моторвагонное депо на станции Ленинград-Товарный-Витебский
In the 1950s – 1960s, along with the electrification of railway sections, Lengiprotrans designed a number of new multiple unit depots, including at the Leningrad-Tovarny-Vitebskiy station (now St...
  • 1990 — 1999
Вагоноколесные мастерские на станции Новосокольники
In the 1990s, Lengiprotrans developed a project for carriage wheel workshops at Novosokolniki station of the Oktyabrskaya Railway. The enterprise carries out overhaul, medium and current repairs...
  • 1980 — 1989
Тепловозное депо на станции Кокчетав II
Kokchetav II (now Kokshetau II) is a railway station of the Kazakhstan railway in the Akmola region of Kazakhstan. Trains follow through it in the direction of the stations Zhanaturmys, Kzyl-Tu,...
Pages