Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
  • 1950 — 1959
Водоснабжение для железнодорожной линии Карасук — Камень-на-Оби
Karasuk - Kamen-na-Obi section of the West Siberian railway, passing in the south of the Siberian Federal District of Russia. In the 1950s, Lengiprotrans developed a project for the...
  • 1940 — 1949
  • 1950 — 1959
Водоснабжение для железнодорожной линии Курган — Атбасар
Kurgan — Atbasar is a meridional railway project developed by Lengiprotrans for the development of virgin lands and transportation of grain crops. Hydrological and hydrogeological surveys of...
  • 1940 — 1949
  • 1950 — 1959
Водоснабжение для железнодорожной линии Кустанай — Кокчетав
Kostanay (now Kostanay) - Kokchetav (now Kokshetau) is a section of the Central Siberian railway in Kazakhstan. The line was designed by Lengiprotrans in the 1950s – 1970s for the development of...
  • 1940 — 1949
  • 1950 — 1959
Вторые пути на участке Пермь — Шаля — Свердловск
The Perm - Shalya - Sverdlovsk (now Yekaterinburg) railway line is the main section of the Kirov - Omsk highway, which provides the shortest transportation of goods from Siberia and the Far East...
  • 1950 — 1959
Укрепление земляного полотна на участке Черняховск — Железнодорожный
In the 1950s, Lengiprotrans developed a project to strengthen the roadbed on the Chernyakhovsk - Zheleznodorozhny railway section in the Kaliningrad region.
  • 1950 — 1959
Укрепление земляного полотна на участке Шауляй — Клайпеда
In the 1950s, Lengiprotrans carried out design and survey work to strengthen the sick embankment at 107 km of the Siauliai - Klaipeda line in the Lithuanian railway.
Pages