Strengthening the subgrade on the Šiauliai - Klaipeda section

Author's department: 
Project Status: 
Укрепление земляного полотна на участке Шауляй — Клайпеда

In the 1950s, Lengiprotrans carried out design and survey work to strengthen the sick embankment at 107 km of the Siauliai - Klaipeda line in the Lithuanian railway.