The Ulyanka passenger stop is located on the 12th km of the Baltic line of the Oktyabrskaya railway. The directions St. Petersburg - Kalische and St. Petersburg - Gatchina-Baltiyskaya pass through...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1954, the Lengiprotrans Plants Department developed a project for a precast concrete plant in Komsomolsk-on-Amur.
Although the department was engaged in work on a plant of this profile for...
In 2000, Lengiprotrans took part in the design of the overpass between Dunaysky Prospekt and the railway tracks of the Vitebsk direction of the Oktyabrskaya Railway. The overpass connected the...
TCh-21 Volkhovstroy is a repair locomotive depot at the Volkhovstroy-I railway station in the Volkhov district of the Leningrad region.
In the 2000s, the locomotive depot was reconstructed...
In the 1960s, Lengiprotrans developed a project for the reconstruction of the production base of the construction department No. 312 of the Balttranstroy trust in Kaliningrad.
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea.
The...
Pages